National Coalition to Save Our Mall
view  view         

Home  •   Search  •   Newsletter/Archive  •   Contact Us   



DONATE

ABOUT THE COALITION
LETTER FROM THE PRESIDENT
   January 2010

HISTORY AND RESOURCES
• Visitor Map & Guide
• Illustrated History
• Future of the Mall VIDEO
• 1902 McMillan Commission   Report

COALITION MALL REPORTS

NATIONAL MALL CONSERVANCY

ANNUAL REPORTS
• 2008 Annual Report (PDF)
• 2007 Annual Report (PDF)
• 2006 Annual Report (PDF)
• 2005 Annual Report (PDF)

GREAT MOMENTS
PHOTO GALLERY
• Who's in Charge?

THE MALL CHRONICLES
• Media Coverage
• Analysis
• Coalition Testimony
• Letters

THE WWII MEMORIAL
• WWII Memorial Archive

WASHINGTON MONUMENT
• Washington Monument Archive  Updated 8/8/2008

U.S. CAPITOL

THREATS & TREATS
ACT NOW
• What You Can Do
• Contribute

WHO WE ARE?
WHAT ARE WE DOING?
WWII Veterans
PRESSROOM
Detailed Search



Slurry Wall

During excavation, excess concrete is chipped from the slurry wall. Sections of rebar are intentionally left exposed to tie in underground utility vaults and the concrete foundation. (Photo: Stefano Tericola) Source: American Battle Monuments Commission

Back to the top



Photo Gallery

• Who's in Charge?
• NFL Take-Over
• Construction
• Security
• Protests
• Family Scenes
• Nevermore ...


Copyright © 2008 National Coalition to Save Our Mall Inc. All Rights Reserved